View Assumptions   View/Change Labor/Material Cost

Without Improved Models
  Engr. Hours Tech Hours Mgmt Hours Cost Time / Schedule
(Weeks)
Design and Test Labor 66.0 32.0 6.0 $6,007 5.2
Material and Fabrication       $2600 2.0
Total for First Pass 66.0 32.0 6.0 $8,607 7.2
Total Number of Circuit Iterations Including First Pass (2 is minimum)
Estimated Schedule Time Per Re-work Iteration (Weeks) 3.6    
Total Cost and Schedule per Design $13,211   10.8

With Improved Models
  Engr. Hours Tech Hours Mgmt Hours Cost Time / Schedule
(Weeks)
Design and Test Labor 56.0 16.0 3.0 $4,455 3.8
Material and Fabrication       $1,600 2.0
Total for First Pass 56.0 16.0 3.0 $6,055 5.8
Total Number of Circuit Iterations Including First Pass
Estimated Schedule Time Per Re-work Iteration (Weeks) 3.9
Total Cost and Schedule per Design $6,055 5.8